Page 16 - DGPS
P. 16

HARD COPY (Check points)




                                    ❖ The check points on the same scale corresponding to each


                                        original sheet / map  should be provided. The above said SOI

                                        points will be considered as Base Points as well as Check points

                                        only as per the approval of Director, MRSAC.




                                    ❖ Symbology and documentation should be as per MRSAC

                                        standard.





                                    ❖ Vendor Quality Checks at least for 10% of assigned points with

                                        ETS and Digital Auto Level conventional method with nearest

                                        SOI Control Points.














                                                                                                                           MRSAC,Nagpur ©®
                                                                                                                            MRSAC,Nagpur ©®
   11   12   13   14   15   16   17   18   19   20   21